You can start mitigation research from seven adopted source records

This seed index gives you seven mitigation research starting points from three public-agency programs. Each entry keeps the lead agency, project, measure identifier, adoption record, and source attachment together. You can open the adopted source before deciding whether its mechanism fits your project.

Here, “precedent” means previously adopted mitigation language. Judicial precedent remains a separate legal source.

Three adopted programs anchor every index entry

Lead agency and project Adoption record Reviewed mitigation program Indexed resource areas
City of Jackson, Oro de Amador Remedial Action Plan, SCH 2025080224 The September 24, 2025 Notice of Determination records approval on September 22, 2025. It marks mitigation measures as conditions of approval and an MMRP as adopted. Attachment A Mitigation Monitoring and Reporting Program Biological resources, recreation/access, and water supply
City of Chico, Big Chico Creek Erosion Repair Project, SCH 2025070810 The August 25, 2025 Notice of Determination marks mitigation measures as conditions of approval and an MMRP as adopted. Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program Biological resources, cultural resources, noise, and tribal cultural resources
East Bay Dischargers Authority, Cargill Mixed Sea Salts Processing and Brine Discharge Project, SCH 2022050436 The July 18, 2025 Notice of Determination records approval on July 17, 2025. It marks mitigation measures as conditions of approval and an MMRP as adopted. CEQA Findings, Statement of Overriding Considerations, and MMRP Air quality, biological resources, cultural resources, hazards, hydrology, noise, and recreation

The lead agency adopted each program for its own project and administrative record. Your project requires its own impact analysis, feasibility findings, performance standard, enforcement mechanism, and monitoring program.

Seven entries give you a cited starting point

Research question Source measure Project context Mechanism to compare
How has a lead agency structured off-site construction NOx mitigation? Cargill Mitigation Measure 3.2-1, “Contribute Funding to an Off-Site Mitigation Program” A mixed-sea-salts processing and pipeline project in the San Francisco Bay Area Program selection, annual construction-emissions quantity, funding amount, geographic nexus, air-district verification, and enforceability
How has a lead agency sequenced investigation and controls for contaminated ground disturbance? Cargill Mitigation Measures 3.7-4a through 3.7-4g in the adopted program Excavation along a 15.6-mile pipeline alignment and related facilities Phase I review, Phase II trigger, agency coordination, soil handling, health and safety planning, utility location, and coated-pavement handling
How has a lead agency assigned an archaeological discovery stop-work process? Cargill Mitigation Measure 3.4-2b, “Halt Ground-Disturbing Activity upon Discovery of Subsurface Archaeological Features” Ground disturbance across on-site and linear construction areas Stop-work area, notification path, qualified reviewer, treatment decision, and work-resumption authority
How has a creek-repair project prepared workers and marked sensitive areas? Big Chico Creek BIO-1 and BIO-2 Erosion repair at three Big Chico Creek sites Training content, covered personnel, sensitive-resource list, field demarcation, and preconstruction timing
How has a creek-repair project tied in-water work to fisheries protection? Big Chico Creek BIO-19 through BIO-22 Rock slope protection and bank stabilization in and beside Big Chico Creek Work window, diversion and fish-relocation plan, pump-screen criteria, erosion control, agency submittal, and closeout
How has a lead agency recorded nesting-bird survey timing and verification? Oro de Amador Mitigation Measure 4.3, “Nesting Bird Survey” A 160-acre remedial action plan site in Jackson Survey window, survey area, active-nest buffer, work lapse, responsible party, timing, and monitoring requirement
How has a lead agency tied water availability to a later approval record? Oro de Amador Mitigation Measure 19.1, “Water Will Serve Letter” Post-remediation development planning Commitment document, issuing agency, approval timing, staff-report record, and monitoring responsibility

The “mechanism to compare” column is an index description written for this page. The linked agency document contains the adopted language.

The source ledger identifies the reviewed bytes

Source attachment Retrieved SHA-256 Indexed content
Oro de Amador MMRP 2026-09-09 04a159b8b3fb1081378471267a66acb57156d83fe9acb9c8f4a57c1af090b46d Measures 4.3 and 19.1
Big Chico Creek MND and MMRP 2026-09-09 8c539d3daf29cfe94320131a271d2ad4b93ec5f6488b65fd0afe38a08ee2f5f1 BIO-1, BIO-2, and BIO-19 through BIO-22
Cargill findings and MMRP 2026-09-09 da41d9bcfbfbc2ae578d8850e3f0984be7f2389bb5e9e2a238082cbbea9506f8 Measures 3.2-1, 3.4-2b, and 3.7-4a through 3.7-4g

A changed source file produces a different hash. Re-review the document before carrying a revised entry forward.

CEQAnet defines the corpus boundary

CEQAnet is the searchable State Clearinghouse database within the Governor’s Office of Land Use and Climate Innovation. It contains key information from CEQA documents submitted for state review since 1990 and full-text copies for documents and notices beginning in March 2019.

LCI states that CEQAnet does not contain every California CEQA document. LCI posts submissions as received and does not review them for legal adequacy. The lead-agency document remains the source for every entry in this index.

The selection method keeps each entry source-bound

An entry enters this seed index only when all five conditions are true:

  1. A CEQAnet project page names the lead agency, project, and SCH number.
  2. The project’s Notice of Determination records adopted mitigation and an adopted monitoring or reporting program.
  3. CEQAnet provides the source attachment that contains the indexed measure identifier.
  4. The index can state the project context and implementation mechanism from the source document.
  5. The review record stores the source URL, retrieval date, and SHA-256.

The current seed contains three projects and seven research entries. A Notice of Determination without the underlying program remains outside the index until the program can be reviewed.

Public Resources Code section 21081.6 sets the monitoring frame

Public Resources Code section 21081.6 requires a public agency to adopt a reporting or monitoring program when it makes the specified finding under section 21081 or adopts a mitigated negative declaration. The program covers project changes or conditions designed to mitigate or avoid significant effects. The measures must be fully enforceable through permit conditions, agreements, or other measures.

CEQA Guidelines section 15097 keeps the lead agency responsible for implementation until the mitigation is complete. It distinguishes reporting from ongoing or periodic monitoring and lets agencies assign program responsibilities and enforcement procedures.

Use those requirements to evaluate the mechanism in context. A measure title alone cannot show enforceability, timing, responsibility, or the source impact finding.

The implementation mechanism determines whether the language fits

Open the impact analysis, adopted findings, and monitoring table together. Check the affected resource, project design, agency jurisdiction, performance objective, implementation timing, responsible party, verification record, and enforcement path. Draft from your project evidence after that comparison.

You open the adopted source before adapting a measure

Choose one indexed research question. Open its linked agency program and verify the measure against your project’s impact, setting, and approval mechanism.

These sources let you verify every index entry

Published 2026-09-09 · Last reviewed 2026-09-09. Review record.